Bank building construction featuring brick exterior with drive-thru

Columbia Bank – Arundel Preserve

This flagship bank was The Columbia Bank’s first in Anne Arundel County. The 4,000 square foot ornate masonry structure is accented by a spire and standing seam metal roof. The branch has a comfortable upscale interior designed to attract and retain depositors. Work was completed in five months despite winter weather delays.

Bank interior Built by Kascon and appointed with quality finish selections and equipped with state-of-the-art amenities

Rosedale Federal Bank

This new bank branch constructed for Rosedale Federal Savings and Loan incorporates classic construction materials and details that are essential in projecting the stability of the institution. Work included complete site development, storm water management and dealing with the challenges of a former gas station site. The two story brick structure includes a branch with training and offices above accessed by a full service elevator. The interior is appointed with Rosedale’s quality finish selections and equipped with state-of-the-art amenities.

Glass and stone exterior built by KasCon commercial general contractors

USS at Dolfield

This Design Build project included renovation of existing structures, the construction of a pre-engineered metal building warehouse addition and a conventionally constructed two story building addition. United Sortation Solutions (now doing business as Intelligrated, a part of Honeywell) engaged KasCon early on to navigate the development process, hire the complete design team and orchestrate a phased construction of their new headquarters facility. Portions of the original structure were demolished while others were renovated. A new pre-engineered addition was erected while the existing renovated sections remained occupied due to the owner’s critical production schedule.

Read more

Building entrance

Guilford Executive Center

This 50,000 square foot Class “A” office building was constructed in a record setting time frame. The duration from Building Permit to Occupancy Permit was less than 7 months that spanned the winter. The building boasts an elaborate three story curtainwall entry facade. Its common areas are appointed with exposed steel, granite and stained cherry. The exterior is an interesting combination of Brick, Stone, and EIFS.