Glass and stone exterior built by KasCon commercial general contractors

USS at Dolfield

This Design Build project included renovation of existing structures, the construction of a pre-engineered metal building warehouse addition and a conventionally constructed two story building addition. United Sortation Solutions (now doing business as Intelligrated, a part of Honeywell) engaged KasCon early on to navigate the development process, hire the complete design team and orchestrate a phased construction of their new headquarters facility. Portions of the original structure were demolished while others were renovated. A new pre-engineered addition was erected while the existing renovated sections remained occupied due to the owner’s critical production schedule.

Read more

Auditorium with multi-level seating and stage for church

Bridgeway Community Church

The + is collaborating with the design team to find an innovative and affordable way to remove structural columns while still supporting the roof. This church required a performance theater for its multi-media approach. The adaptive use project entailed reconstruction of a single-story warehouse. Among other improvements, interior support columns were removed to enhance audience views and support was provided by an intricate exterior cable suspension system. The 1,200-seat theatre/sanctuary, classrooms, conference facility and administrative offices were all supported by new HVAC and electrical systems.